Serving Copiah, Hinds, Madison, Rankin, Simpson, Warren, and Yazoo Counties... |
|
|
|
|
MULTIPLAN
CMPDD, in cooperation with the Mississippi Department of Transportation (MDOT) and Mississippi's other three Metropolitan Planning Organizations (MPO's), is now developing the
"Mississippi Unified Long Range Transportation Infrastructure Plan" (MULTIPLAN).
In December, 2000, the MULTIPLAN received the "President's Award for Planning" from the American Association of State Highway and Transportation Officials (AASHTO). AASHTO recognized
MDOT and the four MPO's for the outstanding planning achievement as the result of the agreement to prepare the first joint Statewide and Metropolitan Area Transportation Plan in the
United States.
In the photograph, Central MS Highway Commissioner Dick Hall is shown holding the AASHTO Award. Pictured with him are representatives from MDOT and Mississippi's four MPO's, including
CMPDD Planning Director Larry Smith, fourth from right.
The Metropolitan Planning Rule issued by the U. S. Department of Transportation requires that "--the transportation plan shall be reviewed and updated--at least every five years in
attainment areas to confirm its validity and its consistency with current and forecasted transportation and land use conditions--." The 2020 Jackson Urbanized Area Transportation Plan
was adopted in June, 1997. During FY 2001, the District, in cooperation with the Mississippi Department of Transportation (MDOT) and the other three MPO's in the State began an update
of the Statewide Transportation Plan and the individual urbanized area components called the "Mississippi Unified Long-Range Transportation Infrastructure Plan" (MULTIPLAN), with a new
horizon date of 2030. The update is being conducted in two phases:
Phase I (FY 2001 and FY 2002): The District (together with MDOT and the other three MPO's) updated existing street and highway networks in their respective urbanized areas. The results
of subarea and corridor studies performed by the District incorporated into an Interim Plan with a horizon year of 2025 that was adopted in December 2001.
Click here for a copy of the 2025 Jackson Urbanized Area Transportation Plan.
Phase II (FY 2003 through FY 2004): The District (and the other three MPO's) will update population, employment, and school enrollment data based upon the 2000 Census. New Origin and
Destination studies will be performed with the assistance of the common consultant. The District will produce new 2030 population, school enrollment and employment projections based
upon updated local Land Use and Transportation Plans. Based upon these updated local plans, a 2030 Jackson Urbanized Area Transportation Plan will be produced as a part of the
MULTIPLAN and submitted to the Federal Highway Administration by the end of FY 2004.
For more information about the MULTIPLAN, contact Larry Smith: lsmith@cmpdd.org
Revised: March, 2006
|